A 40,000 sq. ft. remodel of a library facility
that was in continuous operation. The work was completed in 8 phases, so
that disruption of the operation of the library was at a minimum.
Completion Date: September 1, 2009
Contract Amount: Original: $ 2,199,285.60
Final: $ 2,569,389.93